Projects
Client/Contact |
Project Name |
Description |
Contract Value |
Status |
| Top Toyo Group Contractor: WBHO Contractors Consultants: CKR Consulting Engineers |
Hamilton Hilton Hotel | Re-furb of existing building to accommodate 190 bed Hotel executive suites, including individual D/B’s, customised switching, power points to bedside, dimmer switching, Led lights, individual toilets with necessary technology, A/C etc, customized to Radisson Hotel standards. Install new wireways /upgrade DB’s per each of the 3 Floors to accommodate new supportive supplies, Install LED lighting throughout the passage areas, corridors, general areas, Install back- up generator to the building to support new infrastructure, also connect up new cables to point of supply to emergency supply points, Install wire ways/cable tray to accommodate the data/ camera points as well as the WI-FI technology to the building. Configure and test supply, including DB’s and metering for same. |
R14 Million | Current/On-going |
| Village Mall Bedfordview/ New Checkers Contractor: Iguana Projects Consultants: CKR Consulting Engineers (Ari Micholopoulos) |
Village Mall Bedfordview/ New Checkers store | New installation to Checkers stores at Village View Mall (Bedfordview), Complete new installation of Transformer; RMU; Generator; to supply the New Checkers store at Village Existing Mall Installation: Remove all existing light fittings, remove all existing wireways including all electrical infrastructure, which is cables, data and wi-fi connections, Remove all lights and wireways from toilets and passages and common areas, Install new wireways, and cable trays, baskets to accommodate new installation points throughout the Mall areas, wire up new circuits for the new lighting and power points in various areas. Install contactors and timers for the common lighting and open car parking areas to switch of unnecessary circuits when not in use, Install 10m high Chandeliers to the specific Mall area as per the Clients specification, including providing the necessary power requirements, Connect new installation and Led down lighters to the new infrastructure, new ceilings in Mall area to accommodate new lights, Commission and configure entire lighting and power solution to the Mall. |
R12,5 Million | Current/On-going |
| Old Mutual Wanooka (Parktown) CKR Consulting Engineers Dean Pillay: 011 217 7300 |
KPMG Building – Upgraded to New Old Mutual Head Office (Wanooka Place) | Complete revamp of Electrical installation, including wiring, cable racking, power skirting to accommodate the New Head office and Administration. Complete fit out of the 2750 Call centre, with 2750 data and power outlets points, fitted to the new desktop, including screens outlets. Power points fitted for copiers including normal and dedicated points per each of the 3 floors. Supply and install lighting reticulation of some 3200 lights (600 x 600) LED panels fitted onto grid as per Clients layouts, motion sensors to accommodate same. Power skirting throughout each floor for the 2750 users in the region of 3,500m p/floor x 3. Power reticulation throughout the floors; separated circuits to accommodate dedicated and normal supplies, including emergency circuits, LV/MV supplies, complete main cables supply to each floor to compensate for the New infrastructure and requirements, UPS 120KVA per each Building (Phases x 4) Sections. Generators 2 x New Generators 600KVA installed and configured to remote switching and new bulk tanks built on site, with extraction exhaust systems built from parking area, New cable supply from point of control to Generators, Re-build 2 x 750KVA and configure to specifications, redesign and install new cabling to accommodate same for other building phases, Racking and support systems installed. Training and OME manuals submitted, Technical support provided 24hrs. | R28 Million | 2 months/ 2 shifts 45 Resources
Project period: 3 months |
| Kidzania Fourways: 1st Development in SA Dean Pillay - 011 217 7300 |
Kidzania Fourways: 1st Development in SA | Electrical Installation of complete MV & LV reticulation, including DB installation to various sectors of the development. Full fitment of electrical lighting and power layout to the various PODS. Mini car track layout for Kids play area including Power charge points and street lighting technology. Some of the PODS include: Mini Fire station, Airport-Actual Aeroplane, Court house, Hospital. | R10.2 Million | On going/ Completion 01 December 2018 |
| ACSA - HVAC Energy Infrastructure SSI Consulting Engineers Gary Venter Tel: 012 367 5800 Cell: 072 372 5861 |
OR. Tambo Energy Monitoring Infrastructure | Refurbishment of Distribution Boards and Installation of Schneider Meters | R6,000, 000 | Completed |
| Ekurhuleni EMM Councillor Cassius Nkosi Cell: 073 465 3135 |
Thokoza Hostels 1, 2, 3 of 385 units DB, socket outlets and lights | MV and LV Electrical Installation & refurbishment, complete electrical installation of DB in units 385 and socket outlets, lights |
R12,000,000 | Completed |
| Sandton City Mall: Level 2 WBHO/STANDLIB/CKR Rob Lloyd Tel: 011 217 7300 Cell: 083 6004 779 |
Sandton City Mall (Hamleys; Milky Lane; Spur; Mall area) | Complete Electrical Installation of Lights DB, metering, Dimmer panels, LED tech, also HVAC supply and plantroom configuration. |
R6,3 Million | Completed |
| Sandton City (Liberty 2 Degrees) WBHO Contractors Consultants: CKR Consulting Engineers |
Reconfiguration of Checkers/Tenant fit out/New Installation | Remove all existing wireways from the Checkers area, including cable baskets; trunking; conduits; power outlets and existing Main D/B’s and all sub boards. Terminating and making safe all existing supply points, Installation of New cable baskets and wireways to accommodate new infrastructure, including power outlets, New lighting in all areas as well as staircases and passages, Installation of New Baby lounge, Waste management area, retail stores, Capitec Bank; Wimpy and entrance lighting to new Mall opening areas, Full installation and New DB installed for Checkers area, wire baskets and supply to TV and security cameras; Complete LV/MV supply from SUB 7 to all major DB’s throughout the shops and retail stores, including cables and new racks; cable tray etc. Commission and test all DB’s ; some 650m of 185 x 3 core from Sub 7,8 to main transformer room, including earth. | R25 Million | 9 months |
| Sandton City Level 4/6 WBHO/STANDLIB/CKR Rob Lloyd Tel: 011 217 7300 Cell: 083 6004 779 |
Sandton City Level 4/6 Dischem; Pick & Pay Clothing; Exclusive Books; Superdry | Electrical Installation of Lights DB, metering, Dimmer panels, LED tech, also HVAC supply and plantroom configuration |
R7,8 Million | Completed |
| Sandton City Food Court WBHO/STANDLIB/CKR Rob Lloyd Tel: 011 217 7300 Cell: 083 6004 779 |
Sandton City Food Court | Revamp complete food court area, remodelling and installation of lighting, HDMI fit out, LED tech in public areas, DB upgrade and new installation and wiring, bulkhead lighting and cove lights. Screen supply and Installation, Solar application and fit out. New roof Installation and lighting application to suite innovative ceiling Sandton Food court | R7,7 Million | Completed |
| SANDTON CITY PROJECTS TOTAL VALUE: R46 800 000.00 | ||||
| Parktown Boys High CKR Consulting Engineers Dean Pillay Tel: 011 2177 300 Cell: 083 2254 975 |
Electrical Installation to 3 Storey Hostels complete electrical infrastructure | Electrical installation, Supply to Main board including connecting of City power change over supply, Full lighting installation including UPS back up supply | R2,5 Million | Completed |
| Adcock Ingrams: Eye Drop Centre Nala Consulting Dean Pillay Tel: 011 2177 300 Cell: 083 2254 975 |
Electrical Installation to the Adcock Ingrams Eye drop centre | Electrical Installation to the Adcock Ingrams Eye drop centre, Complete supply and lighting installation |
R3 Million | In Progress |
| Tshwane University of Technology Robenco Construction Emzansi Consulting Engineers Bok Enslin Cell: 072 187 1067 |
Tshwane University of Technology | LV Refurbishment & Installation, HV Refurbishment/Substations | R4,700,000 | Completed |
| Meridean Properties WSP Consulting Engineers Mr Ramdhari Cell: 082 619 1069 |
Time Square Apartments | Refurbishment and new MV and LV Installation | R2,900,000 | Completed |
| Botshabelo Mall Bloemfontein - Stanlib Development MNS Electrical Consulting Engineers Neil Stolle Tel: 011 0252591 Cell: 082 6793 207 |
Botshabelo Mall Bloemfontein | Complete Electrical Infrastructure; Including Building & commissioning of the Sub Station, Construction and installation of 4 X Mini-Subs 500KVA; Complete installation of Main Distribution Boards including connection of 3 x500KVA generators; Internal and External Mall lighting and reticulations; Also tenant fit out i.e Woolworths; Pick & Pay; Shoprite checkers etc; Installation of lighting and supply to various chain stores namely Truworths; Markhams; Foshini; Banks; OK’s; Sportscene; Hungry Lion etc; Cashbuild complete fit out and KFC drive through as well as Taxi rank fit out and addition stores etc | R32 Million | Completed |
| Ford Motor Company - Ford Icubation Facility Silverton Tryis Construction Mr Nico Jacson Tel: 012 4501 600 Cell: 083 300 5705 |
Ford Motor Company: Incubation Facility; Blue IQ initiative/Tswane Municipality Mayoral Project | Complete Installation of Mini-Substation, MV & LV Installation and Tenant Installation, T5 Lighting Energy system, Individual DB supply and council cut into MV supply | R5,6 Million | Completed |
| Ekurhuleni EMM Councillor Cassius Nkosi Cell: 073 465 3135 |
Thokoza Hostels 1, 2 & 3 | MV and LV Electrical Installation & Refurbishment | R12,000,000 | Completed |
| Ekurhuleni EMM Councillor Cassius Nkosi Cell: 073 465 3135 |
Vosloorus Hostel | MV and LV Electrical Installation. | R2,000,000 | Completed |
| M2 Hostels Alexander - Fritz Reiling QS Bureau Tel: 011 791 3888 Cell: 082 556 7114 |
Alexander Hostels | MV and LV Electrical Installation | R9,6500,000 | Completed |